Laserfiche WebLink
Mike Boulay -2- September 21, 2010 <br />during construction of the bridge and spur track, then please also provide' <br />drawings and specifications for the temporary construction route. <br />CAM: The Rail loop, spur track and Bridge are discussed on page 2.05.9. The <br />Bridge over Reed Wash will be a clear span bridge that will not affect waters, <br />wetlands or riparian areas and will not impact the 100-year water elevation. <br />Therefore, a stream ford during construction will not be and furthermore cannot <br />be approved by the Division per Rule 4.03.1(2)(c). New Map-21 shows the plan <br />and profile of the rail loop and spur track as well as the location of the bridge over <br />Reed Wash. <br />As a general note, the Operator has changed the coal reclaim system from <br />Stamler Feeders, to a Reclaim Tunnel. Map 16 has been revised to reflect this <br />change, as well as page 2.05.6. <br />Revised Permit Pages: <br />Application page Number 2 <br />Volume I: Exhibit 1: Right of Entry Documents (closing documents) <br />Exhibit 9: Pages Exh. 9-1 and new permit pages Exh. 9-80, 81, 82, & 83 <br />Text: Page iv <br />2.03-3, 4, 5, 7, 12, 17, 18 <br />2.05-4, 5, 6, 7, 8, 9, 10, 11, 12, 21, 28, 29, 30 and 44 (pages 28, 29 & 30 <br />revised date changed from 08108 to 09110, no substance has been revised) <br />2.10-2 <br />Volume II: Table of Contents <br />Maps - 1, 2, 3, 4, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19 and 21 <br />Sincerely, <br />l? <br />J. E. Stover, P.E. <br />Consulting Engineer <br />Cc: Mike Boulay, GJ Office <br />