Laserfiche WebLink
TABLE 5 <br />Future Depletions and Replacement Schedule <br />Loveland Ready - Mix Concrete, Inc. - Bokelman / Walters Pit <br />(All Values in Acre-Feet) <br /> <br />Month Future Depletions <br />Net Evaporation Production <br />1 2 <br />Total <br />3 City of Loveland <br />Replacement Schedule <br />4 <br />September 0.04 0.59 0.63 0.64 <br />October 0.03 0.56 0.59 0.60 <br />November 0.01 0.58 0.60 0.61 <br />December 0.01 0.38 0.39 0.40 <br />January 0.01 0.24 0.25 0.25 <br />February 0.01 0.29 0.31 0.31 <br />March 0.02 0.41 0.43 0.44 <br />April 0.03 0.57 0.60 0.61 <br />May 0.03 0.56 0.59 0.60 <br />June 0.06 0.56 0.62 0.63 <br />July 0.06 0.55 0.62 0.63 <br />August 0.06 0.59 0.64 0.66 <br />Total 0.37 5.89 6.26 6.37 <br />Notes: <br />[1] Equal to Table 2, Column 6. <br />[2] Equal to Table 4, Column 5. <br />[3] [1] + [2]. <br />[4] Equal to [3] + 1.8% transit loss*[3]. Releases of the City of Loveland's water at the W.C.'s Discretion. <br />If dewatering of the Phase 1 pit was discontinued prematurely, [1] and [3] would be increased by the values shown in Table 3, <br />Column 8 [4] would be increased by 101.8% of the values shown in Table 3, Column 8. L RM requests that in the event that <br />dewatering of the Phase 1 pit is discontinued prematurely that they be able to reduce the amount of free water surface and resulting <br />depletion augmented as the amount of water contained by the slurry wall decreases. <br />BBA H:%9641 -Loveland Ready KWA10 Walters and Bokebnan=10 Andyaia.xls Table S <br />1, watcrconsulrants BISHOP-BROGDEN ASSOCIATES. INC. 8/17/2010 12:38PM JSL