Laserfiche WebLink
MORGAN SAND AND GRAVEL, INC. <br />21215 HWY. 52 <br />FORT MORGAN, CO 80701 <br />970-867-8074 <br />PLANT 3 MILES NORTH OF FORT MORGAN ON HIGHWAY 52 <br />(f) Aprons (Spillways) will be placed on both sides of the dam. That way when we <br />Have a heavy rain, if the Water Control Structure cannot keep up water can <br />discharge out the Spillways. Each Spillway will be (8 feet) wide (12) feet <br />Long. Riprap will be placed in each Spillway. Riprap will be concrete that <br />will come from Morgan Sand & Gravels Recycle yard. <br />(g) Material will come on site from the pit. The dam will be made with a Dozer & <br />A sheep's foot compactor. <br />3. The Second discharge point has been closed using material that was removed <br />from the area when it was opened. Material was replaced using a wheel Loader <br />in addition, compactor. <br />4. Most of the straw bales will stay. The last 2 sets of bales will be removed. That <br />is where the dam will be placed. All others will remain in place to slow runoff <br />down. <br />5. Now there is only (1) runoff point. The Northeast part of the pit <br />has a ditch that carry's water to the south. <br />If you have, any more questions that I need to answer call me at <br />Office: 970-867-8074 <br />Cell: 970-768-0781 <br />Sinc ely, j \ <br />Greg Westho? ff <br />President <br />Morgan Sand & Gravel