Laserfiche WebLink
8. If disposal of source term material in the Minnesota portal is not supported by the <br />assessment, propose alternative disposal options and related assessments to the DRMS. A <br />potential alternative disposal option includes transport to the Canon City Milling Facility <br />for disposal in the tailings impoundments (as was commonly done in the past). If <br />conceptual consensus can be reached on an alternative disposal strategy, submit a different <br />Technical Revision request accordingly. <br />Items 1 and 2 above have already been completed, and an initial sampling design and plan has <br />been mapped in the figure below. Sampling locations may be modified based on site <br />conditions and assessment of results as the project progresses. <br />It is expected that the field work portion of this project will take several weeks. Review of <br />analytical results, technical assessments and reporting are expected to take several months to <br />complete.