Laserfiche WebLink
Does the annulus pressure build back up after the test ? If Yes No psip <br />MECHANICAL INTEGRITY PRESSURE TEST <br />Additional comments for mechanical integrity pressure test, such as volume of fluid added to annulus and <br />bled back at end of test, reason for failing test (casing head leak, tubing leak, other), etc.: <br />The long string of Well 20-33 took less than a barrel of water to fill up the well prior to testing. A <br />maximum pressure of approximately 380 psig was reached with a gradual drop off to 370 psig over <br />the duration of the 30 minute test. Water was removed from the well after the test to 5 feet below <br />ground surface to prevent freezing of the well head. <br />The short string of Well 20-33 was plugged and abandoned in December 2008, thus was not tested <br />for mechanical integrity in 2010. A welded metal cap is in place on the cemented casing. <br />Signature of Witness: <br />OFFICE USE ONLY - COMPLIANCE FOLLOWUP <br />Staff <br />Do you agree with the reported test results? <br />If not, why? <br />Possible violation identified? [ ] YES <br />If YES, what <br />If YES - followup initiated? [ ] YES <br />[ ] NO -why not? <br />[ ] YES [ ] NO <br />[ ] NO <br />Date: <br />[ ] Data Entry [ ] Compliance Staff [ ] 2nd Data Entry [ ] Hardcopy Filing <br />Page 2 of 2