Laserfiche WebLink
3. THE DIRECTION OF MINING HAS BEEN SHOWN. <br />RECLAMATION PLAN MAP: <br />4. THE RECLAIMED SLOPE GRADIENT(S) ARE SHOWN AND NOTED. <br />5. THE ARE NO AREAS THAT VEGETATION WILL NOT BE ESTABLISHED. <br />6. NO OVERBURDEN WILL BE REPLACED. <br />7. THE AVERAGE TOPSOIL WILL BE REPLACE AT BETWEEN 8" TO 12". <br />If I can be of further assistance, please call me at 719-240-9424 or e-mail <br />im!Gri)i11g1% %?om. <br />SincerelyA <br />ioe ag ianoC <br />cc: Stephanie and Ray Sikes Carrizo Stone, LLC <br />File <br />Enclosures: Two (2) copies of the Mining Plan & Reclamation Plan Maps <br />Dated 9/14/2010 <br />Certified Mail Number: 7007 2680 0002 7554 6032 <br /> <br />2