My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-14_REVISION - M1977219
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977219
>
2010-09-14_REVISION - M1977219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:48:35 PM
Creation date
9/15/2010 11:59:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977219
IBM Index Class Name
REVISION
Doc Date
9/14/2010
Doc Name
TR Approval
From
DRMS
To
Summit Brick & Tile Co.
Type & Sequence
TR1
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />September 14, 2010 <br />Joseph C. Welte <br />Summit Brick & Tile Co. <br />P.O. Box 533 <br />Pueblo, CO 81002-0533 <br />COLORADO <br />D 1 V 1 S 1 O N O F <br />RECLAMATION <br />MINING <br />SAFETY <br />Re: Fox No. 1 Clay Pit, Technical Revision Approval, Permit No. M-1977-219, Revision No. TR-1 <br />Dear Mr. Welte: <br />On September 14, 2010 the Division of Reclamation, Mining and Safety approved the Technical Revision application <br />submitted to the Division on August 18, 2010, addressing the following: <br />Remove the mining phases from the permit, limit the maximum affected acres to 25 acres and keep the maximum <br />lineal feet of expose high wall to the approved 1570 feet and keep the maximum high wall height to 25 feet. <br />The terms of the Technical Revision No. 1 approved by the Division are hereby incorporated into Permit No. M-1977- <br />219. <br />The conditions of the Division approval are noted below. Please note that all other provisions of Permit No. M-1977-219 <br />remain in full force and effect. <br />1) The operator will limit the maximum lineal feet of the high wall that will be exposed at any given time not to <br />exceed 1570 feet, with a maximum height of high wall not to exceed 25 feet. <br />2) Phased mining is removed through this revision. The maximum affected area at any given time will not exceed <br />25 feet <br />Because the operator agreed to the above conditions the warranty will not be adjusted at this time. <br />If you have any questions, please contact me. <br />Sincerely, <br />Berhan Keffelew <br />Environmental Protection Specialist <br />cc <br />Office of Office of <br />..__J ?..J 1?_?I____a:__ ll..... ...- - r-....J I......a:.... - fl..--....... A ...:. ... .....J I.....w:. ... AA:....?
The URL can be used to link to this page
Your browser does not support the video tag.