Laserfiche WebLink
C - 1OLS 1-O Z-Z <br />fq 2--9 Z <br />Stark, Jim <br />From: Stark, Jim <br />Sent: 14 September, 2010 15:26 <br />To: Boulay, Mike <br />Cc: Brown, Sandy <br />Subject: Oxbow MR-92 RCE <br />Attachments: Oxbow MR-92 RCE.pdf <br />Mike, <br />Attached is the reclamation cost estimate for the Oxbow MR-92 - sealing two angle-drilled GVB's. The estimate is two <br />tasks (a summary sheet and task 271) and represents an increase in liability of $3,054.00. The sealing of the boreholes <br />is based on the new Oxbow sealing plan (50 foot surface plug) approved with TR-66. Both holes will be drilled from an <br />existing drill pad (which is already bonded) so there are no earthwork tasks/costs. I have a copy of the estimate in for <br />scanning and I will have the original sent to you. Please let me know if you have any questions or need any additional <br />information. <br />James R. Stark <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />303-866-3567 X8145 <br />www.mining.state.co.us