Laserfiche WebLink
and Reclamation Permit (Number M-77-493). As such, once approved, the EPP will become an <br /> element of this existing permit. <br /> For purposes of the record, the Climax Mine is wholly owned by the Climax Molybdenum <br /> Company, a wholly owned subsidiary of the Cyprus Climax Metals Company. The Cyprus <br /> Climax Metals Company is a wholly owned subsidiary of the Cyprus Metals Company which, <br /> in turn, is a wholly owned subsidiary of the Cyprus Amax Minerals Company. <br /> 1.1.1 Reference and Indexing <br /> Since the Climax Mine is an active operation with an approved Mining and Reclamation Permit, <br /> much of the information and data required for the EPP has been developed previously. Where <br /> such information is part of the public record and official permit files, that information is <br /> referenced but is not reiterated herein. Only information that presently is not part of the public <br /> record or is required specifically under the Act is included in the Appendices. <br /> 1.1.2 Changes in Referenced Information and Documents <br /> Changes in the reclamation plan can trigger the need for submittal of a formal Amendment, <br /> g p gg <br /> Technical Revision, or Modification depending upon the type of change as defined in the Rules. <br /> Because the EPP references numerous public record documents and information on file with the <br /> DMG and other state regulatory agencies, notification relative to changes, particularly minor <br /> ones, can rapidly become unwieldly for both Climax and the DMG. Therefore, Climax proposes <br /> to handle minor changes in referenced documents and information by establishing a central file for <br /> the reclamation plan and associated EPP information and documents at the Climax Mine <br /> environmental office. Climax will conduct an annual review of the EPP to identify where major <br /> changes have occurred and where major changes may occur during the following year. This <br /> review will coincide with the annual review and update of the Spill Prevention Control and <br /> Countermeasures and Materials Containment Plan, portions of which are in Appendix B A <br /> report of this review will be filed with DMG. Climax proposes the initial review under this <br /> concept for the end of calender year 1996. <br /> 1.2 Description of Site <br /> The Climax Mine is an open pit and former underground mining operation which extracts, <br /> • crushes, and processes molybdenite ore from the base of Bartlett Mountain and produces <br /> 2 <br />