My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-10_GENERAL DOCUMENTS - C1981028
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2010-09-10_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:21:57 PM
Creation date
9/14/2010 8:49:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/10/2010
Doc Name
Proposed Decision & Findings of Compliance for SL5
From
Phase II for 51.05
Permit Index Doc Type
Findings
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RnAneRI F I=ni uPMF:NT sheet 2 of 2 <br />Machine <br />Description <br />Total <br />Cost/hour /unit <br />Fleet Size <br />(No. units) <br />Haul Trip <br />Cost/hr /fleet <br />Return Trip <br />Cost/hr /fleet <br />-Water Tanker, 3,500 Gal. <br />$58.35 <br />1 <br />$58.35 <br />$58.35 <br />-Light Duty Pickup, 44, 1 T. Crew <br />$38.57 <br />2 <br />$77.13 <br />$77.13 <br />-Fuel Tanker, 4x2, 170 HP <br />$63.62 <br />1 <br />$63.62 <br />$63.62 <br />-tube Truck, 4x2, 170 HP <br />$71.52 <br />1 <br />$71.52 <br />$71.52 <br />- Generic 8 -10 cy, 6x4 <br />$66.15 <br />3 <br />$198.44 <br />$198.44 <br />- Generic 12 -18 cy, 6x4 <br />$82.82 <br />6 <br />$496.93 <br />$496.93 <br />- Flatbed Truck, 4x2, 30K GVW <br />$47.52 <br />1 <br />$47.52 <br />$47.52 <br />JOB TIME AND COST <br />Total job time: <br />3.60 hours <br />Total job cost: <br />$5,600 <br />Subtotals : <br />$1,013.51 <br />$1,013.51 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Brighton <br />Transportation Cycle Time: <br />Non- <br />Total one -way travel distance : <br />20.0 miles <br />Roadable <br />Roadable <br />Average travel speed : <br />50.0 mph <br />Equipment <br />Equipment <br />Haul time (hours) = <br />0.40 <br />0.40 <br />Total non - roadable mob /demob cost*: <br />$4,789.19 <br />Return time (hours) = <br />0.40 <br />0.40 <br />' two round trips with haul rig <br />Loading time (hours) = <br />0.50 <br />NA _ <br />Total roadable mob /demob cost ** : <br />$810.81 <br />Unloading time (hours) = <br />0.50 <br />NA <br />•• one round trip, no haul rig <br />Subtotals = <br />1.80 <br />0.80 <br />JOB TIME AND COST <br />Total job time: <br />3.60 hours <br />Total job cost: <br />$5,600 <br />
The URL can be used to link to this page
Your browser does not support the video tag.