Laserfiche WebLink
CIRCES Cost EslimatingSoftware <br />DEMOLITION WORK <br />STRUCTURE or ITEM DESCRIPTION <br />DIMENSIONS <br />DEMOLITION MENU SELECTION <br />QUANTITY <br />UNIT <br />UNIT COST <br />TOTAL COST <br />-1. Powder magazine - cinder block walls <br />21'x 28'x 10'h <br />Demo. /disp. /existing pit- 10K' haul <br />5,880.00 <br />CF <br />$0.2027 <br />$1,192.01 <br />- poder magazine concrete floor <br />21'x 28' <br />Demo. /disp. exs. pit, 4" th.- 10K ft. <br />588.00 <br />SF <br />$1.1381 <br />$669.19 <br />-2. Office building -metal <br />81'x 70' x10'h <br />Demo. /disp. /existing pit - 10K' haul <br />56, 700.00 <br />CF <br />$0.1982 <br />$11,238.61 <br />- Office building floor & foundation <br />81'x 70' <br />Demo. /disp. exs. pit, 4" th.- 10K ft <br />5,670.00 <br />SF <br />$1.1381 <br />$6,452.95 <br />-3. Shop Building -metal <br />61'x 70'x 28'h <br />Demo. /disp. /existing pit - 10K' haul <br />119,560.00 <br />CF <br />$0.1692 <br />$20,225.23 <br />- Shop building -Floor <br />61'x 70'x 1'th. <br />Demo. /disp. exs. pit, 12" th.-10K ft. <br />42,700.00 <br />SF <br />$3.4143 <br />$145,788.83 <br />-4. Storage Shed <br />18'x 11'x 12'h <br />Demo. /disp. /existing pit - 10K' haul <br />2,376.00 <br />CF <br />$0.1982 <br />$470.95 <br />- storage area, mic. equip. & supplies <br />27000 CY <br />Demo. /disp. /existing pit - 10K' haul <br />27,000.00 <br />CF <br />$0.1982 <br />$5,351.72 <br />-5. Remove powerline <br />6000 fin. ft. <br />Power /phone line - single pole <br />6,000.00 <br />LF <br />$2.5400 <br />$15,240.00 <br />-6. Remove Culverts <br />50'1 x 96" dia. <br />Pipe, CMP - 96 in. diam. <br />50.00 <br />LF <br />$30.8135 <br />$1,540.68 <br />-7. Shop building west concrete apron <br />18'X 98'x 0.83' th <br />Demo. /disp. exs. pit, 10" th. -10K ft. <br />1,764.00 <br />SF <br />$2.8452 <br />$5,018.96 <br />-8. Concrete slab East Apron @ shop <br />40'x 18'x 0.83'th <br />Demo. /disp. exs. pit, 10" th. -10K ft. <br />720.00 <br />SF <br />$2.8452 <br />$2,048.55 <br />-9. concrete slab - loading dock <br />9'x 14'x 0.5'th <br />Demo. /disp. exs. pit, 6" th.- 10K ft. <br />126.00 <br />SF <br />$1.7071 <br />$215.10 <br />-10. Skid mounted garage <br />28'x 26'x 18'h <br />Demo. /disp. /existing pit - 50' push <br />13,104.00 <br />CF <br />$0.1867 <br />$2,446.23 <br />-11. 7.1 mile fencing <br />7.1 miles <br />Fencing, barbed wire, - 3 strand <br />37,488.00 <br />LF <br />$1.0700 <br />$40,112.16 <br />-12. Sewage Itreatment Plant <br />11' x 30'x 10'h <br />Demo. /disp. /existing pit - 1OK' haul <br />3,300.00 <br />CF <br />$0.1982 <br />$654.10 <br />- Sewage TMt. plant concrete slab <br />11 x 30x.33th. <br />Demo. /disp. exs. pit, 4" th.- 10K ft. <br />330.00 <br />SF <br />$1.1381 <br />$375.57 <br />-13. Petroleum tanks and support <br />15x 20'x 15'h (tanks) <br />Haul to cart. dump - 3K- 5K gal. <br />1.00 <br />EA <br />$660.0000 <br />$660.00 <br />- Tank storage sill <br />15'x 20'x 0.33th <br />Demo. /disp. exs. pit, 4" th.- 10K ft. <br />300.00 <br />SF <br />$1.1381 <br />$341.43 <br />JOB COST Subtotal (unadjusted): $260,042 Total Cost (adjusted for location): $251,799 <br />