My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-10_GENERAL DOCUMENTS - C1981028
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2010-09-10_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:21:57 PM
Creation date
9/14/2010 8:49:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/10/2010
Doc Name
Proposed Decision & Findings of Compliance for SL5
From
Phase II for 51.05
Permit Index Doc Type
Findings
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />CIRCES Cost Estimating Software <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />05a State :Colorado Permit/job #: C -1981 -028 <br />0910312010 County: Weld Abbreviation :none <br />JHB Site :Keenesburg Strip Mine Filename :CO28 -05a <br />Permit or other job action : S15 <br />Task description: Backfill Pit B <br />HOURLY EQUIPMENT COST <br />Cost Brc <br />Shift basis : 1 per day <br />Equipment Description <br />Scraper work team -Scraper: Cat 637G w /push -pull <br />-Push dozer: NA <br />Support equipment -Load area : Cat D9R - 9SU (2005) <br />-Dump area :NA <br />Road maintenance -Motor grader: CAT 14H <br />-Water truck: Water Tanker, 3,500 Gal. <br />sheet 1 of 2 <br />akdown : <br />Scraper Work Team <br />Scraper Dozer <br />Support Equipment <br />Load area Dump area <br />Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : <br />scraper2 <br />NA <br />dozer <br />NA <br />grader <br />misctruk <br />% Utilization-machine: <br />- Ripper attachment : <br />100 <br />NA <br />100 <br />NA <br />25 <br />25 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownerhip cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />$109.89 <br />NA <br />$58.16 <br />NA <br />$41.68 <br />$11.98 <br />$173.96 <br />NA <br />$101.59 <br />NA <br />$12.15 <br />$6.08 <br />NA <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />$38.72 <br />NA <br />$38.54 <br />NA <br />$38.91 <br />$38.70 <br />Unit subtotals : <br />Number of units :1 <br />$322.57 <br />NA <br />$198.29 <br />NA <br />$92.74 <br />$56.76 <br />4 <br />0 <br />1 <br />0 <br />1 <br />1 <br />Group subtotals : <br />Work: $1,290.28 <br />Support : $198.29 <br />Maintenance : $1,19.50 <br />Total work team cost/hour : $1,638.06 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 265,372 BCY factor : 1.266 volume: 335,913 LCY <br />Source of quantity take -off :2008 Annual Reclamation Report <br />Source of estimated swell factor: Caterpillar Handbook <br />
The URL can be used to link to this page
Your browser does not support the video tag.