My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-02-06_REVISION - M1977493 (14)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
1996-02-06_REVISION - M1977493 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:02 PM
Creation date
9/13/2010 2:29:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
2/6/1996
Doc Name
SWMP-III
From
CMC
To
DMG
Type & Sequence
TR7
Email Name
ACS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Chapter 4-Site-Spedllc Industrial Storm Water BMPs <br />11 <br />• <br />Advantages of Security <br />• Provides a preventive safeguard to operational malfunctions or other facility disturbances <br />(routine patrols) <br />• Allows easier detection of vandals or thieves (lighting) <br />• Allows easier detection of spills, leaks, or other releases (lighting) <br />• Prevents spills by providing good visibility ('fighting) <br />• Prevents unauthorized access to facility (access control) <br />Disadvantages of Security <br />• May not be feasible for smaller facilities <br />• May be costly (e.g., installation of lighting systems) <br />• May increase energy costs as a result of additional lighting <br />• May not be feasible to have extensive access controls at smaller facilities <br />4-47
The URL can be used to link to this page
Your browser does not support the video tag.