Laserfiche WebLink
CYPRUS CLIMAX MINE STORM WATER MANAGEMENT PLAN <br /> BMP IDENTIFICATION <br /> (SECTION 2.3.1) <br /> Date of Identification: 7/6/96 By: W. W. Wheeler and Associates,Inc. <br /> Evaluation Deadline Date: <br /> (Plate No. q <br /> Key Number: I (area centered 16000N, -6400E) <br /> Description: Haul roads for removal of tailing from Eagle Park Reservoir during reclamation <br /> Type of Character of Potential Pollutant: Sediment load from disturbed area <br /> BMP Detailed Control, Practice or Activity <br /> Good Housekeeping <br /> Preventive Maintain drainage ditches and control structures. <br /> Maintenance <br /> Inspections <br /> Spill Prevention <br /> or Containment • <br /> Sediment and Silt fences along ROW. Minimize cut/fill slopes. Temporary seeding/final reclamation. Grade haul roads with crown or side slope to <br /> Erosion Control facilitate quick drainage from roadway. <br /> Management <br /> of Runoff <br /> Other Specific Temporary check dams in Upper North Inlet to trap silt. <br /> Activities <br />