Laserfiche WebLink
-4- <br />12. Primary future (Post-mining) land use check one : <br />Cropland(CR) Pastureland(PL) <br />n Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />13 <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />14. Mdbod of Briefly explain mining method (e g. truck/shovel): <br />Push material into pile, then loaded on trailer or stodcpiled. <br />15. on Site Precudw gi g <br />13.1 Briefly explain mining method (e g. tmck/shovel): <br />Move topsal and material with dozer and wheel loader, possiiAil'dy mobile processing at some time. <br />List any designated chemicals or acid producing materials to be used or stored within permit area: <br />none to be used on permitted area <br />16. U, of Amesdme4t or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />