Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />Task #: 07A State : Colorado Permit/job # : C-81-028 <br />Date : 0910312010 County :Weld Abbreviation :none <br />User: JHB Site : Keenesburg Filename : C028-07A <br />Permit or other job action : S15 <br />Task description :haul 165,210 cu yd topsoil to Pit B <br />HOURLY EQUIPMENT COST <br />Cost Bre <br />Shift basis : 1 per day <br />Equipment Description <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />-Push dozer: NA <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader : CAT 14H <br />-Water truck : Water Tanker, 3,500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA grader misctruk <br />% Utilization-machine : 100 NA NA NA 25 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $109.89 NA NA NA $41.68 $11.98 <br />Operating cost/hour : $173.96 NA NA NA $12.15 $6.08 <br />Ripper op. cost/hour : NA NA NA NA $0.00 iNA <br />Operator cost/hour : $38.72 NA NA NA $38.91 $38.70 <br />Unit subtotals : $322.57 NA NA NA $92.74 $56.76 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work:-$1,290.28 Support: $0.00 Maintenance : $149.50 <br />Total work team cost/hour : $1,439.77 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 165,210 CCY factor : 1.060 volume : 175,123 LCY <br />Source of quantity take-off : Coors Weld County Permit Application <br />Source of estimated swell factor : Caterpillar Performance Handbook 23rd. ed. <br />sheet 1 of 2