Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />Task #: 05B State :Colorado Permit/job # :C-1981-028 <br />Date : 0910312010 County: Weld Abbreviation :none <br />User : JHB Site :Keenesburg Strip Mine Filename :C028-05B <br />Permit or other job action : S15 <br />Task description : Spoil backfilled on pit B '05-08 No Bond Release <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Equipment Description <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />-Push dozer : NA <br />Cost Brf <br />Support equipment -Load area :LCat D9R - 9SU (2005) <br />-Dump area :INA <br />Road maintenance -Motor grader : CAT 14H <br />-Water truck : Water Tanker, 3,500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer NA grader misctruk <br />% Utilization-machine : 100 NA 100 NA 25 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $109.89 NA $58.16 NA $41.68 $11.98 <br />Operating cost/hour : $173.96 NA $101.59 NA $12.15 $6.08 <br />Ripper op. cost/hour : NA NA $0.00 NA $0.00 NA <br />Operator cost/hour : $38.72 NA $38.54 NA $38.91 $38.70 <br />Unit subtotals : $322.57 NA $198.29 NA $92.74 $56.76 <br />Number of units : 4 0 1 0 1 1 <br />Group subtotals : Work : $1,290.28 Support: $198.29 Maintenance : $149.50 <br />Total work team cost/hour : $1,638,06 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 127,326 BCY factor : 1.266 volume : 161,172 LCY <br />Source of quantity take-off :2008 ARR, 2007 ARR, 2006 ARR, 2005 ARR, SL 1 & SL2 <br />Source of estimated swell factor : Caterpillar Handbook