My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-09_PERMIT FILE - X200823002
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X200823002
>
2010-09-09_PERMIT FILE - X200823002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:21:55 PM
Creation date
9/10/2010 10:41:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200823002
IBM Index Class Name
PERMIT FILE
Doc Date
9/9/2010
Doc Name
Letter & Lease Request For Approval & BLM Lease
From
Blue Mountain Energy
To
DRMS
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Drilling and Abandonment Information Required to be Submitted to the Field Office Manage <br />One copy of the following must be submitted within 30 days after each calendar year: <br />1. Lithologic and geophysical logs and any other required logs of strata penetrated and conditions encountered <br />appropriately identified by the hole number. <br />2. Analyses of coal and other pertinent tests appropriately identified by chill hole number. Identify types of tests <br />that were run (proximate, ultimate, moisture-mineral-matter free basis, etc), and whether the reported results were <br />analyzed or calculated as composite or incremental samples. <br />3. Drill hole location map showing lease or license boundary, coal crop lines, drill hole numbers, and township, <br />rank mid section lines and numbers. <br />4. List of drill hole number and depths drilled. <br />B. An abandonnncnt report must be submitted after the drill holes have been properly conditioned for abandonment or if <br />approved in advance, converted to monitoring wells. Tic report should contain the following: <br />1. For abandoned holes, describe or illustrate the method by which each hole was plugged and conditioned for final <br />abandonment. <br />2. For holes converted to monitoring wells, describe or illustrate the well completion method (cementing, casing set, <br />perforation interval, etc.), what aquifer(s) is being monitored, duration and frequency of monitoring, and types of tests <br />planned (pH, conductivity, pump, cation, etc.) <br />3. Status of reclamation of all disturbed areas. <br />4. List of hole numbers and depths drilled. <br />C. Abandonment inspections will be conducted upon completion of operations to determine if drill holes are properly <br />plugged and disturbed areas are reclaimed. Once the Field Office Manager determines that the holes are adequately <br />plugged and conditioned for abandonment and reclamation is acceptable, final abandonment approval will be given by <br />the Field Office Manager. <br />For drill holes converted to monitoring wells, inspections will be made to determine if the wells are properly <br />completed, drill sites are reclaimed, and access roads are properly water-barred or otherwise maintained to minimize <br />erosion. <br />The following shall be submitted within one year after the completion of drilling operations: <br />1. Any coal reserve base,•minable reserve base or recoverable coal reserves estimates generated from the <br />exploration license. <br />ITEM B
The URL can be used to link to this page
Your browser does not support the video tag.