Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID #: M-1990-041 <br />INSPECTION DATE: 27 Lily 2010 INSPECTOR'S INITIALS: QRZ <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION DATE <br />1. Problem: The operator does not appear to be engaged in mining and activity at the site <br />appears to be consistent with the Indications of Temporary Cessation described in Rule 1.13.2. <br />Correc tive Action: To bring th e operation into compli ance with 6 34-32-103(6)(a) an d Rule 1 1 <br />within 60 days from th <br />d <br />te f <br />ili <br />f <br />h i <br /> e <br />a o <br />ma <br />ng o <br />t <br />is insp ection report. provide ev <br />dence that mini <br /> <br />activity <br />is occurring on the site <br />or file a notice of Tem <br />porary Cessation as required by m <br />Rule 1.13.2., <br />accom panied by the $115 fee <br />11/02/2010 <br />PB or PV: PB <br />TOPIC(S): _Adfp? <br />2. Problem: The financial warranty is not at a level that reflects the actual cost to reclaim the site /rgp/ <br />Corrective Action: To bring the operation into compliance with §34-32-11 7(4)(b)(I) R and Rule <br />4.2.1. the operator must provide additional financial warranty sufficient to bring the total financial <br />warranty up to $13,730. Official notification of the increase will be sent under separate cover, and <br />the operator will have 60 days from the date of that letter to provide the additional amount <br />PB or PV: PB <br />TOPIC(S): FAQ[