My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-07_REVISION - C1981019 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-09-07_REVISION - C1981019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:21:42 PM
Creation date
9/7/2010 2:09:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
9/7/2010
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Colowyo Coal Company, L.P.
Type & Sequence
TR86
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />COLORADO <br />D I V I S ION OF <br />RECLAMATION <br />MINING <br />SAFETY <br /> Bill Ritter, Jr. <br /> Governor <br />September 7, 2010 <br />Mike King <br /> Executive Director <br />Kurt Blunt <br />Colowyo Coal Company L.P. <br /> <br />5731 State Highway 13 Loretta E. Pineda <br />Director <br />Meeker, CO 81641 <br />Re: Colowyo Coal Mine (Permit No. C-1981-019) <br />Proposed Decision - Technical Revision No. 86 (TR-86) <br />South Taylor Haul Road Certification and As-Built <br />Dear Mr. Blunt: <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision for Technical <br />Revision No. 86 at the Colowyo Coal Mine. Notice of the proposed decision will be published in the <br />Craig Daily Press as soon as possible. The first publication will initiate the ten (10) day public comment <br />period for the Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The material <br />should be sent within 15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of <br />Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the <br />Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond <br />that equals or exceeds the Revised Liability. This Technical Revision must not be implemented until this <br />proposed decision becomes final and until any required increase in bond is submitted to and approved by <br />the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />11??, I -D <br />James R. Stark <br />Environmental Protection Specialist <br />Enclosure <br />cc: Carl Johnston, Office of Surface Mining, with enclosures <br />G :FR 06 G4991019 jR8 <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.