My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-03_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2010-09-03_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:21:36 PM
Creation date
9/3/2010 2:02:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REVISION
Doc Date
9/3/2010
Doc Name
Letter and Application
From
Blue Mountain Energy
To
DRMS
Type & Sequence
MR144
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MASTER TABLE OF CONTENTS <br />• 141 Sump Dewatering Hole (SDH#4) Details <br /> 142 "D" Portal Area Process Ponds PP-1 and PP-2 Plan, Section & Details <br /> 143 SDH#3 Detailed Grading Plan <br /> 144 SDH#4 Detailed Topo <br /> 145 General Arrangement and General Area Topo - SDH #4 <br /> 146 Small Area Exemption - Road Base Storage Pad <br /> 147 Areas under Small Area Exemption <br /> 148 Deleted <br /> 149 TS#2 Sediment Pond (Temporary Coal Laydown Area) <br /> 150 Refuse area 2-3 and 4 Combination <br /> 151 "B" Seam Shaft Light Use Road and Pad Area <br /> 152 Plan and Profile Proposed Light Use Road to Shaft <br /> 153 Return Shaft #1, Light Use Road and Pad Area <br /> 154 B-Seam Rock Dust Hole RDH-2 <br /> 155 B-Vent Shaft #2, SH-1, SH-2, RDH-3 <br /> 156 B-Vent Shaft #3 <br /> 157 Service Hole SH-3 <br /> LISTING OF ILLUSTRATIONS <br /> ILLUS. # TITLE <br /> 1-1 Geophysical Logs <br />• 1-2 <br />1-3 Typical Road Ditches Design Calculations <br />Typical Culvert Design Calculations <br /> 1-4 Refuse Area 1, Sediment Pond and Diversion Ditch Design Calculations <br /> 1-5 Deleted <br /> 1-6 Deleted <br /> I-6A Refuse Area 5-A Sediment Pond and Diversion Ditch Design Calculations <br /> 1-7 D Portal Sediment Pond (DP-1) and Diversion Ditch Design Calculations <br /> 1-8 Refuse Area Sediment Estimates <br /> 1-9 Scullion Diversion Design Calculations <br /> 1-10 Culvert Design Calculations/Haul Road, Scullion Gulch and Red Wash <br /> Tributary <br /> 1-11 Culvert Design Calculations/County Road Scullion Gulch <br /> 1-12 Ditch & Culvert Design/Vent Entry Area <br /> 1-13 See Illustration 46 for Water Discharge Permit <br /> 1-14 LOGS <br /> 1-15 LOGS <br /> 1-16 LOGS <br /> 1-17 CMLRD Comments and Responses <br /> 1-18 OSM Comments and Responses <br /> 1-19 CDOW Comments and Responses <br /> 1-20 Geotechnical Investigation/D Portal <br /> 1-21 Geotechnical Investigation/Refuse Area <br /> 1-22 "D" Portal Post-Reclamation Sediment Dam Design Calculation <br />• 1-23 Subsidence/Strain Calculations Room and Pillar Area <br />Minor Revision #144 (9/2010)
The URL can be used to link to this page
Your browser does not support the video tag.