Laserfiche WebLink
J. J. Dudash -2- August 31, 2010 <br />3, Map 9-7 of Volume 9 and revised page 138 of Section 2.05 with any new <br />structures within the current permit area and within the proposed transferred <br />portion of the permit area. <br />BRL - Enclosed in updated Table 11, amended page 138 of Section 2.05 and Map 9-7. <br />4. Approved page 113c of Section 2.05 mentions exploration wells P-1-03-03 and <br />2010-2. However, revised page 113C of Section 2.05 does not contain any <br />reference to these two wells. Please explain. <br />BRL - Exploration well P-1-03-01 is incorrectly cited as exploration well P-1-03-03 on <br />the approved page 113C. I do not think there was ever a well P-1-03-03. Exploration <br />hole 2010-2 was approved after revised page 113C was submitted under PR-04. <br />Exploration hole 2010-2 has been added to revised page 113c with a notation that <br />liability for the hole will be transferred to the Bowie No. 2 Mine. <br />5. On revised page 113c of Section 2.05, please remove the reference to Map 4-1 for <br />exploration hole P-BRL- 1-03-01 since that well designation does not appear on <br />the revised map. <br />BRL - The reference to Map 4-1 for exploration hole P-BRL-1-03-01 was deleted. <br />6. On revised page 113c of Section 2.05, please change the rule citation near the top <br />of the page from (3)(b)(iii) to (3)(b)(ii). <br />BRL - The rule citation at the top of the page was revised. <br />7. In the first paragraph on revised permit text page 116 of Section 2.05, not all of the <br />original hydrologic monitoring sites are mentioned. In order to avoid any confusion, <br />please either include all of the original monitoring sites in this section of the text or <br />mention that the list is not complete and reference the monitoring site tables in <br />Volume 4, along with the already referenced Map 4-1, for a complete listing. <br />BRL - The requested note was added to page 116. <br />8. The revised text in Section 2.05.6(3) discusses the transfer to Bowie No. 2 of the <br />stream monitoring sites and the ground water monitoring wells but only some of <br />the monitored springs and ponds. Please expand the discussion to include all of <br />the monitored springs and ponds, either directly or by reference to the monitoring <br />site tables in Volume 4. <br />BRL - The monitoring site tables that show all of the hydrologic monitoring stations for <br />which the Bowie No. 2 Mine has assumed responsibility is referenced on page119.