Laserfiche WebLink
Mr. Berhan Keffelew <br />August 31, 2010 <br />Page 2 <br />17 Cooling Tower 833-11-PPA-001 through 833-11-PPA-004 <br />18 Warehouse 141-02-PPA-001, 004, 005, 016, 017 and 018 <br />20 Cement Silos (4) 710-03-PPA-002, 008, 009, 010, 017, 019, 026, 028, 035 and 037 <br />22 Rail Yard AB-5 (to support SKETCH RAILYARD #1) <br />23 Grinding Aid Containment AB-2 (to support SKETCH 100-01, Grinding Aid Secondary <br />Containment <br />Please note that Drawings AB-1 through AB-5 were prepared by Abel Consulting Services, Inc. <br />("Abel"). Abel performed an engineering survey of the dimensions of the structures indicated. These <br />drawings verify and support the engineering drawings that were provided in GCC's June 30, 2010 <br />submittal as indicated above. <br />This submittal completes Technical Revision No. 1 and GCC's June 30, 2010 submittal. Please <br />contact Ms. Barbara Hodgson, at (719) 647-6829, if you have any questions about these documents or <br />the Technical Revision. <br />Sincerely, <br />iance <br />Manager <br />Enclosures