Laserfiche WebLink
<br /> <br /> O <br /> <br /> <br /> <br /> O W <br /> f <br /> (O <br /> C7 <br /> O <br /> O <br /> ° <br /> O co <br /> Y. W <br /> <br /> C9 <br /> O° <br />o° o'L <br />x (V <br />° <br />ry <br />? <br /> <br /> x <br /> <br /> <br /> <br />C9 <br />p O <br />} O <br />14 "` Z <br />O <br />O <br />st <br />2 <br />Xo° <br />O /X <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL. FEET <br />PROPOSED GROUND SURFACE CONTOUR EL. FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />„? --?- PREVIOUSLY DEPLOYED LINER <br />DEPLOYED LINER <br />NOTES: <br />APPROXIMATELY 117.133 SQUARE FEET OF SECONDARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK. <br />APPROXIMATELY 2,035.936 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />0 o Y <br />Do + <br /> x <br /> ? <br /> c" CRIPPLE CREEK & VICTOR <br />G32+00 px - 1 GOLD MINING COMPANY <br />?- <br />?:; <br />Paaccr <br />PHASE 5 VLF <br />{{ I <br /> TITIE <br /> PHASE 5 GEOMEMBRANE INSTALLATION <br /> PSSA 100 MIL SECONDARY <br /> <br /> DESIGNED BY CMT CHECKED BY JDN DATE <br /> DRAWN BY CMT APPROVED BY JON 06/21/10 <br />D4+ <br />p2+00 __ 1 EARTH AND ENVIRONMENTAL _ CAW AN" <br />- mm "o. REV <br /> 3 0