Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 01a State : Colorado Permit/job# : M-1986-040 <br />Date : 0812512010 County :Routt Abbreviation :none <br />User : DMC Site :Bear River S&G Filename :M040-01a <br />Agency or organization name: DRMS <br />Permit or other job action :112c SDG <br />Task description :Slope reduction of pond banks <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (20011 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :NA <br />Horsepower :_ 310 <br />Shift basis 1 per day <br />Data source : (CRG) <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $46.56 NA <br />Operating cost/hour : $70.63 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $155.72 Total fleet cost/hour : $155.72 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,881 LCY factor : NA volume : 5,881 LCY <br />Source of estimated volume :site /permit file <br />rce of estimated swell factor : NA <br />S ou <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.)---- <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile :_ 0.70 (fnd-mf) <br />- Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,520 _ <br />feet Material weight 0.71 (Cat HB) <br /> - Blade type : 1.00 (S/SU/U) <br />ht : <br />l wei <br />i <br />t <br />M 250 <br />3 Ibs/LCY Net correction : 0.28 <br />g <br />er <br />a <br />a , - - <br />Weight description <br />Adjusted unit production : <br />388.41 <br />LCY/hr <br />Gravel - Pitrun <br /> Adjusted fleet production : 388.41 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size Dozer(s) Total job time : 15.14 Hours <br />Unit cost : $0.401 /LCY Total job cost : $2,358 <br />