My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-25_REVISION - M1979181
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979181
>
2010-08-25_REVISION - M1979181
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:20:02 PM
Creation date
8/31/2010 2:17:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979181
IBM Index Class Name
REVISION
Doc Date
8/25/2010
Doc Name
Amendment Approval, Rev No. AM-1, (Ruby Trust Mine)
From
DRMS
To
Mount Sneffels Mining Company, LLC
Type & Sequence
AM1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $1.14 NA NA NA NA NA NA NA NA NA NA <br />Economic life - Loader and ROPS : $1.14 NA NA $1.75 $1.33 $1.42 $0.94 NA NA NA NA <br />- Attachment No. 2: NA NA NA $0.00 $0.00 $0.00 $0.00 NA NA NA NA <br />Annual usage : $2.87 $1.38 $1.23 NA NA NA NA NA NA NA NA <br />Double shifts : $2.15 $0.69 $0.62 NA NA NA NA NA NA NA NA <br />Triple shifts : $1.91 $0.46 $0.41 NA NA NA NA NA NA NA NA <br />Mechanic Labor - Loader and ROPS : NA NA NA $1.02 NA $0.83 NA NA NA NA NA <br />- Attachment No. 2 : NA NA NA $0.00 NA $0.00 NA NA NA NA NA <br />Fuel/tube - Loader : NA NA NA NA NA NA NA $6.02 $0.80 $0.86 $0.07 <br />-Attachment No. 2 : NA NA NA NA NA NA NA $0.00 $0.00 $0.00 $0.00 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Loader, ROPS and Attachments : Loader and ROPS : <br />Single shifts : $2.87 $1.38 $1.23 $1.02 $1.33 $0.83 $0.94 $6.02 $0.80 $0.86 $0.07 <br />Double shifts : $2.15 $0.69 $0.62 ttachment no. 2 <br />Triple shifts : $1.91 $0.46 $0.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />... _. ......_. ... <br />HOURLY OPERATOR WAGES ......... ........ _.. <br />Base ..... .. .................... <br />Fringe ____ . ........ _... <br />F.I.C.A. <br />Unempl. <br />Wk.Comp. <br />Total <br /> Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 2 <br />Loader operator (<=6cy) $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Day : $0.00 Two shift per day average : $0.15 <br />Loader operator (> 6cy $23.82 $9.22 $1.82 $1.48 $2.38 $38.72 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $16.74 $4.20 $1.28 $1.04 $1.67 $24.93 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $5.48 $11.87 $0.00 $38.54 $55.89 <br />Double shifts : $3.46 $11.87 $0.00 $38.69 $54.01 <br />Triple shifts : $2.78 $11.87 $0.00 $38.79 $53.44 <br />NT PERFORMANCE DATA Machine Machine Machine Machine <br />Horsepower length width height weight <br />Machine description Transmission type Fuel type (fhp) (ft) (ft) (ft) (UST) <br />CAT 246 (2004) NA Diesel 74.0 11.75 5.67 6.83 3.58 <br /> Minimum Struck Heaped Maximum Basic <br /> turning capacity capacity loading cycle time <br />Bucket type circle (ft.) (cy) (cy) height (ft.) (min.) <br />Loader bucket : GP with bolt-on teeth 14.17 0.38 0.53 7.67 0.425 <br /> Ground speeds (fpm) at rated engine RPM <br /> Transmission gear: 1st 2nd 3rd 4th <br /> forward : 660 NA NA NA <br /> reverse : 607 NA NA NA
The URL can be used to link to this page
Your browser does not support the video tag.