Laserfiche WebLink
Agency or organization name: DRMS <br />Permit or other job action :Amendment AM-1 <br />Task description :Pull up edge of benches and move sed <br />HOURLY EQUIPMENT COST <br />Machine description : Cat 315C L <br />Horsepower : 110 <br />Weight (MT) : 16.90 <br />Cost Breakdown : Utilization % <br />Ownership cost/hour : $23.87 NA Shift basis : 1 per day <br />Operating cost/hour : $24.92 100 Data source : (CRG) <br />Operator cost/hour : $38.72 NA <br />Total unit cost/hour : $87.51 Total fleet cost/hour : $87.51 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,500 CCY factor : 1.215 volume : 3,038 LCY <br /> <br />Source of estimated volume :X-sects and maps: creek bank, benches, sed ponds <br />Source of estimated swell factor :na <br /> <br />.... , - :....... :: .. .... ..... <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket swing loaded, dump bucket, swing empty) <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.26 minutes <br />Bucket Capacity <br />Rated bucket capacity : 0.77 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.68 Rock - Well blasted (60% - 755/o) <br />Adjusted bucket capacity : 0.52 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 10,300 feet Altitude adjustment : 0.87 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Net job correction : 0.72 multiplier <br /> <br />Unadjusted hourly unit production : 121.82 LCY/hour <br />Adjusted hourly unit production : 87.96 LCY/hour <br />Adjusted hourly fleet production : 87.96 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 34.53 hours <br />Unit cost : $0.995 per LCY Total job cost : $3,022 <br />