My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-25_REVISION - M1979181
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979181
>
2010-08-25_REVISION - M1979181
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:20:02 PM
Creation date
8/31/2010 2:17:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979181
IBM Index Class Name
REVISION
Doc Date
8/25/2010
Doc Name
Amendment Approval, Rev No. AM-1, (Ruby Trust Mine)
From
DRMS
To
Mount Sneffels Mining Company, LLC
Type & Sequence
AM1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $11.54 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Dozer and ROPS : $11.54 NA NA $4.71 $8.80 $5.81 $8.53 NA NA NA NA <br />-Attachment no. 2: NA NA NA $0.00 $0.00 $0.00 $0.00 NA NA NA NA <br />Annual usage : $18.97 $10.21 $11.75 NA NA NA NA NA NA NA NA <br />Double shifts : $14.23 $5.10 $5.88 NA NA NA NA NA NA NA NA <br />Triple shifts : $12.65 $3.40 $3.91 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $2.75 NA $3.39 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.00 NA $0.00 NA NA NA NA NA <br />Fuel/lube -Dozer and ROPS : NA NA NA NA NA NA NA $20.59 $4.27 $0.00 $1.42 <br />Attachment no. 2: NA NA NA NA NA <br />........... NA NA $0.00 $0.00 $0.00 $0.00 <br />ADJUSTED COST SUBTOTALS Ownership Costs Overhaul and Operating Costs <br /> <br />Depreciation <br />CFC <br />Overhead Overhaul <br />Labor Parts Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Dozer, ROPS and Attachment no. 2: Dozer and ROPS : <br />Single shifts : $18.97 $10.21 $11.75 $2.75 $8.80 $339 $8.53 $20.59 $4.27 $6 $1.42 <br />Double shifts : $14.23 $5.10 $5.88 [Attachment no. 2 <br />Triple shifts : $12.65 $3.40 $3.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp) $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Day : $0.00 Two shift per day average : $0.15 <br />Dozer operator (>=70hp) $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $16.74 $4.20 $1.28 $1.04 $1.67 $24.93 Night : $0.45 <br />::::::. :. . _::. .. <br />. . <br />HOURLY EQUIPMENT COST SUMMARY _ ........ .. ... .... <br /> <br />Ownership _. .... ........ <br /> <br />Operating and Overhaul <br />Machine Attachments <br /> <br />Operator <br /> <br />Total <br />Cost/hr ($) <br />Single shifts : $40.93 $49.75 $0.00 $38.54 $129.22 <br />Double shifts : $25.21 $49.75 $0.00 $38.69 $113.64 <br />Triple shifts : $19.96 $49.75 $0.00 $38.79 $108.50 <br /> <br />EQUIPMENT PERFORMANCE DATA <br /> <br />Description .-..-..-..-.-: <br />Horsepower <br />(FHP) ..... .: ... <br />Transmission <br />Type <br />Weight <br />(UST) <br />Length <br />(ft) ......... <br />Width <br />(ft) <br />Height <br />(ft) <br />Fuel <br />type <br />Ripper <br />type <br />Dozer : Cat D71? DS Series 11- 7S 240 NA 27.3 19.8 8.3 11.6 diesel NA <br />Blade : Semi-Universal NA NA 4.0 NA 12.1 5.0 NA NA <br />Attachment no. 1 : ROPS Cab NA NA NA NA NA NA NA NA <br />Attachment no.2: NA NA NA NA NA NA NA NA NA <br />Total weight : 31.3 1 (UST)
The URL can be used to link to this page
Your browser does not support the video tag.