Laserfiche WebLink
. Eagle Park Reservoir <br /> Sampling Summary Information <br /> Sediment Sampling <br /> b' 'v : To verify the removal of tailing material and completion of source removal in <br /> Eagle Park Reservoir- Samples were collected following removal of the all tailing. <br /> Date: November 6, 1996 <br /> Methods: See Attached Map <br /> • Composite samples taken from 30, 2-acre areas below high water mark in Eagle <br /> Park Reservoir. <br /> • Twelve representative samples selected based upon SAP were analyzed for <br /> total metals and leachable metals. The remaining 18 samples have been <br /> archived. <br /> Results: See Attached Summary Tables <br />