Laserfiche WebLink
Table 3 <br /> Climax-Eagle Park Reservoir <br /> Analytical Results: Preliminary Soil Sampling <br /> Sampling Events: May 29 and July 17,1996 <br /> SC-1 SC-1 <br /> Parameters May 29,1996 July 17,1996 <br /> Arsenic,total 1.3 U 1 B <br /> Cadmium,total 2.7 7 B <br /> Chromium,total 8 6 B <br /> Copper,total 12 9 B <br /> Iron,total 13,200 18,100 <br /> Lead,total 36 30 B <br /> Manganese,total 116 166 <br /> Mercury,total(inorganic) 0.09 B 0.02 U <br /> Nickel,total 9 14 B <br /> Selenium,total 0.5 B 0.2 B <br /> Silver,total 0.7 B 3 U <br /> Zinc,total 26 40 <br /> Percent Solids 76.9 90.6 <br /> Notes: <br /> All units are in mg/Kg. <br /> SC-l soil samples are composite soil sample of bottom material from Eagle Park Reservoir. <br /> U=Analyte was analyzed for but not detected at the Method Detection Limit(MDL). Value reported is the MDL. <br /> B=Analyte concentration detected at a value between the MDL and Practical Quantitation Limit(PQL). <br /> .t =—=m W— <br /> _OU=Environmental <br /> D:`P^P 6102W IUNN..\IS�oil99% <br />