Laserfiche WebLink
II I I II I II I II IIII III <br /> 999 <br /> • <br /> Eagle Park Reservoir <br /> Sampling Summary Information <br /> Development of the Sampling Analysis Plan (SAP) <br /> Objective: To establish a sampling plan with appropriate protocol, Quality Assurance, <br /> and Quality Control to demonstrate source (tailing) removal and water quality within <br /> Eagle Park Reservoir. <br /> Date: June 1996 <br /> Specifies: <br /> 0 High level Quality Assurance and Quality Control (QA/QC). <br /> • 3rd-Party sampling. <br /> • 3rd Party Analysis at using a Contract laboratory Procedure (CLP) Certified <br /> Lab. These laboratories are certified by the USEPA under an analytical <br /> • program developed to fill the need to provide legally defensible analytical <br /> results. <br />