Laserfiche WebLink
I i I I I I 11 II II ! 1 11 11 31 11 <br /> Kumar and Associates, Inc. <br /> Ceotcchnical h Environmental Engineers <br /> 2390 S. LIPAN ST., DENVER, CO. 80223 <br /> (303) 742-9700 • FAX 742-9666 <br /> TO: W.W. Wheeler & Associates, Inc. PRO►7EC.T NO. 95-435 DATE 12/21/95 <br /> 3700 South Inca Street DAILY REPORT NO. 3 SHEEP 1 OF 1 <br /> Englewood, 00 80110 SUBJECT: OBSERVATICN REPCRT <br /> Outlet Construction, Dam No. 4 <br /> ATIY1: Douglas Seely, P.E. Eagle Park Reservoir, Cyprus Climax Metals, <br /> Climax, Eagle County, 00 <br /> OBSERVATICVS <br /> We visited the site to pick up samples of the flow fill placed on December 20. <br /> Larry Miller of ASI/RCC, Inc. , indicated that the tent around the inlet structure would not be heated after <br /> Saturday, 12/23/95. We observed that insulating blankets adequately covered the structure and that heat was being <br /> put into the pipe from both ends. Temperatures at the site are now going below 0°F, although the temperature inside <br /> the blanketed flaw fill placement area was 40°F. <br /> cc: File, Book, SBH S.A. Bender Marcus J. Pardi, P.E. <br /> Field Observer Reviewed By <br />