Laserfiche WebLink
' " � � � ► 1 ! 11 1 ! II <br /> X-& A Kumar and Associates, Inc, <br /> ti Geotechnicai d Enfironmentat Engineers <br /> 2390 S. LPAN ST., DENVER, CO. 80223 <br /> (303) 742-9700 0 FAX 742-9666 <br /> TO: W.W. Wheeler & Associates, Inc. PROJECT NO. 95-435' DATE 12/19/95 <br /> 3700 South Inca Street DAILY REPORT .NO. 1 SHEET 1 OF 1 <br /> Englewood, CO 80110 SUBJECT: OBSERVATION REPORT <br /> Outlet Construction, Dam No. 4 <br /> ATIN: Douglas Seely, P.E. Eagle Park Reservoir, Cyprus Climax Metals, <br /> Ciiliiax, E gie C--- Co <br /> OBSERVATIONS <br /> We visited the site and met with Doug Seely of W.W. Wheeler & Associates. He showed us the site and discussed <br /> the scope of the work to be performed and the number of observations he would require for this project. <br /> We observed the outlet pipe and tenting over it. <br /> We advised Mr. Seely that a sample of the flow fill would be taken for ccupressive strength testing, and told <br /> him that all loose and frozen material needed to be removed prior to fill placement. <br /> cc: File, Book, SBH S.A. Bender Marcus J. Pardi, P.E. <br /> Field Observer Reviewed By <br />