Laserfiche WebLink
6.4.2 Exhibit B - Index Map <br />No comment. <br />6.4.3 Exhibit C - Pre-mining and Mining Plan Map(s) of Affected Land <br />No comment. <br />6.4.4 Exhibit D - Mining Plan <br />2. The Applicant has stated there will be a thirty (30) foot setback from the limits of mining to <br />the permit boundary. Please commit to delineating the setback with monuments or other <br />markers. <br />The Applicant has stated a scale house will be installed. Please indicate if a foundation will <br />be constructed for the scale house. If so, provide the composition and dimensions of the <br />structure. The Division requires this information to complete the financial warranty cost <br />estimate. <br />4. On page D-5 of the application the Applicant states "The stockpile will be located along the <br />CR 37 and the property line to the east". Please clarify if this sentence refers to the topsoil <br />stockpile or an overburden stockpile. If overburden will be stockpiled along the CR 37, then <br />the please revise the Mining Plan Map to show this stockpile. <br />5. The Applicant has indicated the 4.11 acre cottonwood gallery will remain undisturbed. Please <br />note the Division will consider the permit area to be 40.02 acres and the disturbed area to be <br />35.91 acres. <br />6. The Applicant has stated an unreclaimed prelaw mine site is present in Mining Area 3 of the <br />proposed permit boundary. A section of sand and gravel, which created an island, was left in <br />place near the center of the southern permit boundary. The Applicant indicated in Exhibit L <br />the slopes of this island would be graded from the current 1H:1V slopes to 3H:1V slopes. <br />However, the Reclamation Plan Map depicts a level pit floor in the area of the island, <br />indicating the deposit will be mined. Please clarify if the gravel island will be mined or if it <br />will be left undisturbed and revise all exhibits accordingly. The Applicant should note that <br />reclamation will be required on all affected land. <br />7. The Mining Plan states excess overburden may be placed in Mining Area 3. Please clarify if <br />the overburden will placed on the pit floor as part of final reclamation or if the overburden <br />will be placed in a stockpile to be replaced during reclamation. If the overburden will be <br />stockpiled, then provide an estimate of the volume of the overburden stockpile. <br />8. Please confirm the topsoil stockpile will not exceed 6,000 cubic yards.