My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-30_REVISION - C1981008 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2010-08-30_REVISION - C1981008 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:20:28 PM
Creation date
8/31/2010 7:09:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
REVISION
Doc Date
8/30/2010
Doc Name
Revised Bond Release Application
From
Greg Lewicki and Associates, PLLC
To
DRMS
Type & Sequence
SL12
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Topsoil Replacement Thickness <br />• <br />As can be seen in the Phase 2 topsoil thickness samples table below, topsoil was placed at a <br />sufficient thickness in both Phase 2 areas. The average thickness in Area 2 is only lower than <br />the approved thickness due to sample point TS51. TS51 is located just south of BB Road <br />(Map R-1). Topsoil is always thinner near roads, due to the presence of the outside slopes of <br />the underlying road bed spreading out onto adjoining land. Therefore, point TS51 should be <br />removed from the calculation of the average topsoil thickness for Area 2. Without TS51, the <br />average topsoil thickness over Area 2 is 43 inches. This satisfies the minimum required post- <br />mine topsoil thickness of 37 inches for this area. <br />Phase 2 Area - Topsoil Thickness Samples Tahlel <br />Required Topsoil Thickness Sample Point Thickness (ft) Thickness in <br />in <br />Phase 2 Area 1 <br />23-39 TS54 4.0 48 <br />23-39 TS58 3.0 36 <br />23-39 TS62 3.1 37 <br />23-39 TS63 3.6 43 <br /> Average 3.4 41 <br />Phase 2 Area 2 <br />37-49 TS49 3.3 40 <br />37-49 TS48+150N2 2.9 35 <br />37-49 TS50 4.0 48 <br />37-49 TS51 0.9 11 <br />37-49 TS69 4.0 48 <br /> Average 3.4 40 <br /> Average (w/o <br />TS51) 3.6 43 <br />'All sample points can be seen on Map R-1. <br />2TS48+150N was a sample point taken in July 2010 150 feet north of the already sampled point TS48. This was <br />to provide another sample point for the Phase 2 Area 2 topsoil measuring. <br />SL-12 DRAFT 20AUG10.wpd 30
The URL can be used to link to this page
Your browser does not support the video tag.