Laserfiche WebLink
CIRCES Cost EstimatingSoftware <br />DEMOLITION WORK <br />PROJECT IDENTIFICATION Agency or organization name: DRMS <br />Task #: 01a State : Colorado PermiVjob# : M-1977-310 <br />Date : 24-Aug-2010 County :Montrose Abbreviation :none <br />User: GRM Site:Jd-6 Mine Filename:M310-01a <br />Permitting action : Final Reclamation Liability Estimate - 2010 update <br />Task description : demolish and remove mine structures <br />UNIT COSTS Last unit cost update : March 2009 Location adjustment : 96.83% <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />-power line 200' of single pole line Power/phone line - single pole 200.00 LF $2.7737 <br />_ <br />---.$554.74 <br />_ <br />-concrete pad for vent #1 8X8" pad Push rubble into pit - to 50 ft. 16.00 CY $0.3700 $5.92 <br /> <br />-concrete pad for vent #2 <br />8'X 8' pad <br />Push rubble into pit - to 50 ft. <br />16.00 <br />CY <br />$0.3700 _ <br />_ $5.92 <br />-misc debris approx. 75 CY Load/haul/dump rubble-to 1, 000 ft. 75.00 CY $0.7450 $55.88 <br /> <br />JOB COST Subtotal (unadjusted): $622 Total Cost (adjusted for location): $603