Laserfiche WebLink
Date : 0812412010 <br />User : GRM <br />Abbreviation :none <br />Filename :M310-09a <br />Permit or other job action :Final Reclamation Liability Estimate - 2010 Update <br />Task description :Initial mobilization to site <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Cost Breakdown <br />County :Montrose <br />Site :Jd-6 Mine <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-reveg equipment 10.00 $25.00 $88.67 1 $113.67 $88.67 $0.00 <br />_ <br />_ <br />-Cat D8R Series ll - 8SU (20 52.55 $46.56 $125.45 1 $172.01 $125.45 _ <br />'0.00 <br />-CAT 938G (2003) 14.45 $22.39 $88.67 1 $111.06 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $396.74 $302.79 $0.00