My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-25_INSPECTION - M1986040
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1986040
>
2010-08-25_INSPECTION - M1986040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:20:01 PM
Creation date
8/30/2010 12:13:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986040
IBM Index Class Name
INSPECTION
Doc Date
8/25/2010
Doc Name
Inspection Report
From
DRMS
To
Bear River Sand & Gravel
Inspection Date
8/17/2010
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinq Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 01a State :Colorado Permit/job# :M-1986-040 <br />Date : 0812512010 County :Routt Abbreviation :none <br />User : DMC Site :Bear River S&G _ Filename :M040-01a <br />-- <br />Agency or organization name: DRMS <br />Permit or other job action :112c SDG - -- <br />Task description :Slope reduction of pond banks - <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series// - 8SU (200,1 Horsepower 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : NA <br />Shiftbasis : 1 per day <br />Data source : (CRG) <br /> Utilization <br />% <br />Cost Breakdown : Ownership cost/hour : $46.56 NA <br /> Operating cost/hour : $70.63 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $155.72 Total fleet cost/hour : $155.72 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,881 LCY factor : NA volume : 5,881 LCY <br />Source of estimated volume : site / permit file -- --- <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br /> <br />: <br />Average push distance 50 feet Material consistency : 4 <br />0.90 (Cat HB) <br />- <br />_ 0 LCY/hr <br />_1 <br />400 Dozing method : 1.00 (gen.) <br />Unadjusted hourly production : , <br />. (av <br />) <br /> Visibility : 1.00 g. <br /> <br />: <br />Material consistency description Job efficiency : 0.83 (1 shift/day) <br /> <br />t <br />Spoil pile : <br />0.70 fnd-m <br />(_ _ o _ <br />Compacted fill or embankmen 1 <br />00 (Cat HB) <br />- -- Push gradient : . <br /> 00 % (pos) <br />0 Altitude : 1.00 (Cat HB) <br />Average push gradient : . 71 <br />0 (Cat HB) <br />d 520 feet <br />6 Material weight : . <br />e : <br />Average site altitu , 00 <br />1 (S/SU/U) <br /> Blade type : . <br />h 250 Ibs/LCY <br />3 Net correction : 0.28 <br />t : <br />Material weig , <br />Weight description <br />Adjusted unit production : <br />388.41 <br />LCY/hr <br />Gravel - Pitrun <br />- -- " Adjusted fleet production : 388.41 LCY/hr
The URL can be used to link to this page
Your browser does not support the video tag.