Laserfiche WebLink
12. Prima future (Post-mining) land use check one : <br />1i Cropland(CR) ]]Pastureland(PL) <br />Rangeland(RL) -0 Forestry(FR) <br />0 Residential(RS) ? Recreation(RC) <br />-0 Developed Water Resources(WR) <br />13. <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />-4- <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />_ Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Materials will be mined using front end loaders, trucks, conveyors and scrapers. <br />15. On Site Processing: V Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Excavate with front end loader and convey material to a processing plant then crush and wash excavated materials. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />See attached Chemical Inventory List <br />16. Descriution of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />N/A - <br />•