Laserfiche WebLink
Station General Location Result <br /> 7A - 7C Hubbard Creek No significant change <br /> 17A -17F Hubbard Creek No significant change <br /> 1A-1J D4 Headgate and <br />North Mains & B7 Mining complete. Maximum subsidence 2.4' over D4 <br />head ate 1A B7 brought max subsidence to 7.1'. <br />?l 23A - 23C Mouth of Dove Gulch 23B subsided 0.39 for a total of 0.54 <br /> 29A - 29D WD2 Panel Outcrop 29A has subsided 1.6' <br />,J 30A - 30D WD Panels Outcrop No significant change <br />?I 31A - 31 C D1 Tailgate An consistent subsidence of about 0.7' <br />?I 32A-32M B-2 Panel 32F Subsided 8.4'. Subsidence monument installed after <br />D-Seam was mined. <br /> <br />33A-331 <br />B-3 Panel 33A Subsided 6.2'. Subsidence monument installed after <br />D-Seam was mined. 33A destroyed by drill pad <br />reclamation <br />?I 34A-34K B-3 Panel 34-A Subsided 5.4 Subsidence monument installed after <br />D-Seam was mined. 34-B Subsided 6.1'. <br />?l 35A-35D B-3 Panel 35-C Subsided 7.5'. Subsidence monument installed after <br />D-Seam was mined. <br /> B-4 Panel No subsidence monuments over B-4. <br /> 8A-8D B-5 Panel 8A - 8D located on the northern edge of B-5 and above 13- <br />6 show a consistent subsidence of about 10.0' <br /> <br />9A <br />B-6 Panel 9A located in the southern edge of B-6 panel subsided 8.2 <br />feet. 6' is attributable to the D Seam. The initial mining <br />in B-6 likely triggered the 7/1/07 Freeman Gulch <br />landslide. <br /> 5C B-7 Panel 5C located in the center of the B-7 panel subsided 10.0' <br /> 37-A <br /> 37-B Terror Creek To confirm subsidence does not occur in the limited <br /> 37-C extraction zone along Terror Creek or the Transmission <br />Line <br /> 37-D <br />?l 37-E Transmission Line Established May 2010 <br /> 37-F <br />?l Surveyed during reporting period. <br />Lines 24, 25, 26 and 27 are no longer monitored. <br />-3-