Laserfiche WebLink
Operation Description -General <br />The mining plan for Yoast was developed in conjunction with the Seneca II and II-W mining plans and is <br />based on standard mining practices, feasibility studies, and balancing production between mines. As <br />shown on Exhibit 12-1 and Figure 12-1, the mining reserves at the Yoast Mine lie in inegular shaped areas <br />along ridge tops. The area will be mined from cropline to appro>omately the 100 foot recovery line. <br />TABLE 12-2 <br />YOAST MINE <br />ANNUAL COAL PRODUCTION <br /> 2 Total Tons <br />Year(s)+ Coal Acres Dra line HW Miner Totals <br />1995 0 0 0 0 <br />1996 6.08 137,000 0 137,000 <br />1997 41.18 905,400 0 905,400 <br />lggg 58.33 892,230 0 892,230 <br />1999 39.62 670,600 0 670,600 <br />2pp0 61.86 774,540 0 774,540 <br />2001 73.51 1,031,330 0 1,031,330 <br />2002 59.91 1,008,120 0 1,008,120 <br />2003 44.71 863,570 0 863,570 <br />2004 <br />2005 31.6 <br />30.0 846,020 <br />505,000 169,900 <br />0 815,920 <br />505,000 <br />2006 3.7 113,400 0 113,400 <br />Totals 450.5 7,547,210 189,900 7,717,110 <br />Notes <br />'Stripping at Yoast began in October 1996. Data through 2004 are actual production numbers <br />ZCoal Acres comes pods with areas in reduction for dra line coal roduction onl , <br />• <br />• <br />• <br />PR-02 6 Revised 10/05 <br />