Laserfiche WebLink
?6kpp ? ??XO \ \?\ <br />Bq+pp Fro O <br />p \ ?_ <br />gZki-"" F4+00 X <br />kpp M j?` ?, ?, ? ??? \ o0 Fop+? <br />O <br />C9 <br /> <br />00 <br />X <br />OOx9 <br />0 <br />00+010 <br />O <br />O <br />N <br />r <br />O <br />00? <br />0 <br />0 <br />0 <br />o° <br />?x <br />O <br />O <br />cLDU 1 <br />0 <br />0 <br />00 <br />w <br />°°v <br /> <br /> LEGEND <br /> EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br /> PROPOSED GROUND SURFACE CONTOUR EL. FEET <br /> EXISTING UNIMPROVED ROAD/TRAILS <br /> EXISTING IMPROVED ROADWAYS <br /> <br /> EXISTING DRAINAGES <br /> V- <br />i----?- PREVIOUSLY DEPLOYED LINER <br /> ?I DEPLOYED LINER <br /> <br /> <br /> NOTES <br /> APPROXIMTTELY 173,344 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br /> APPROXIMATELY 1,865,839 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br /> I <br /> <br /> I <br /> <br /> <br /> <br />/o <br />T,--- <br />AJ <br />W <br />Cum CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PR=CT <br />PHASE 5 VLF <br />+ TIRE <br />= PHASE 5 GEOMEMBRANE INSTALLATION <br />PSSA PRIMARY 100 MIL <br />O covneac DESIGNED BY arr [!NECKED BY JON DATE <br />+ DRAWN 9Y CMT APPROVED 8Y JON 08/07/10 <br />N <br />= EARTH AND ENVIRONMENTAL CAM FILIDt" nouRE Na RFY <br />3 0