Laserfiche WebLink
CERTIFIED MAIL <br />RETURN RECEIPT NO. 7009 2250 00010627 6436 <br />August 23, 2010 AGGREGATE <br />INDUSTRIES <br />Mr. Jim Dupler <br />Division of Reclamation, Mining & Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Permit No. M-1989-120 - Platte Valley Operation - 112c Annual Report and Map <br />Dear Jim: <br />Enclosed is Check No. 401793 in the amount of $791.00 together with the annual report form for the <br />above-referenced permit and an updated map. As noted in previous annual reports, mining has been <br />completed in all cells/phases of the Platte Valley operation except the processing plant area and concrete <br />batch plant site (Cell 5/Phase 5). These areas will continue to operate with material being conveyed from <br />Aggregate Industries' adjacent Wattenberg Lakes operation (Permit M-2004-051). It is anticipated that <br />mining within Phase 5 areas will not occur until all material from the Wattenberg site has been processed <br />through the Platte Valley plant. <br />Backfilling of Phase 4 continued during the permit year ending July 16, 2010, and backfill activity in this <br />cell will continue throughout the life of the mine in accordance with the permit reclamation plan and the <br />inert fill import notice approved by the Division on November 15, 2005. Monitoring and management for <br />weeds in previously seeded areas is ongoing. <br />Very truly yours, <br /> <br />Connie N. Davis <br />Land Advisor <br />Enclosures <br />cc: Aggregate Industries - WCR, Inc. - File #30.04.03 <br />Aggregate Industries <br />West Central Region, Inc. Connie N. Davis, Land Advisor <br />1707 Cole Blvd., Suite 100 P. O. Box 337231, Greeley, CO 80633 <br />Golden, CO 80401 Phone: (970) 336-6526; Fax: (970) 378-6856 <br />Telephone: 303-985-1070 An Equal Opportunity Employer