Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 02a State : Colorado Permit/job# : M-2002-119 <br />Date : 0812012010 County : Routt Abbreviation :none <br />User : DMC Site :Fetcher/Vale Pit Filename :M119-02a <br />Agency or organization name: DRMS <br />Permit or other job action :112c SDG <br />Task description : Topsoil application <br /> <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (200,1 Horsepower: 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $46.56 NA <br />Operating cost/hour : $70.63 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $155.72 Total fleet cost/hour : $155.72 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 17,750 LCY factor : NA volume : 17,750 LCY <br /> <br />Source of estimated volume :16.5 acres to depth of 8 inches <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> . Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 491.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Loose _stockpile Spoil pile : 0.70 (fnd-mf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,300 feet Material weight : - <br />1.44 - <br />(Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.75 <br />Weight description <br />Top Soil Adjusted unit production : 369.61 LCY/hr <br /> Adjusted fleet production : 369.61 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 48.02 Hours <br />Unit cost : $0.421 /LCY Total job cost : $7,478 <br />