My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-19_INSPECTION - M2000158
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2000158
>
2010-08-19_INSPECTION - M2000158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:19:25 PM
Creation date
8/25/2010 7:35:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000158
IBM Index Class Name
INSPECTION
Doc Date
8/19/2010
Doc Name
Corrective Action
From
Platte Sand & Gravel, LLC
To
DRMS
Inspection Date
7/8/2010
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />P.O. Box 712 Littleton, Colorado 80160 <br />Ph 303-238-1130 Fax 303-237-3212 <br />August 17, 2010 <br />Mr. Jared Ebert (/ <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., #215 <br />Denver, CO 80215 <br />Dear Mr. Ebert; <br />RE: Platte Sand & Gravel LLC ? <br />S&H Mine, Permit # M-2000-158 <br />/ Inspection 7/08/10 <br />(jf try h ?r i? <br />Divisinrl 4Y Y c Cs' f 6ELi?°, <br />-to V 'snirg and ftfety <br />The following information is in response to the Inspection Report of July 8, 2010. It contains <br />the necessary items requested in the Corrective Action section of the report. We will respond to each <br />in the order presented. f <br />Inspection Topic: Hydrologic Balance <br />Problem: Petroleum product spillage and cleanup. <br />We disposed of the contaminated soils at Waste Management's Buffalo Ridge Landfill. We <br />removed 4 truck loads of material from the area removing approximately 4 feet of gravely <br />material until we reached the clay barrier under the fuel area. <br />2. A copy of the disposal contract and the load tickets showing where the material was disposed <br />are attached. <br />3. The attached pictures show the site before removal, and during removal showing that the area <br />of concern has been cleaned. We placed all barreled material in a secondary containment <br />shed. Pictures of the shed and floor are provided for the file. This structures is shown in the <br />structure the floor is a grave with a catch area capable of retaining any spills. The front of the <br />shed was elevated to provide additional protection so any fluids would stay in the building. <br />The floor area has a spigot on it where any spilled material can be removed. We note that the <br />fuel storage tank is contained within a concrete containment structure. <br />4. A copy of our Spill Prevention Control and Countermeasure Plan is attached. <br />Inspection Topic: General Compliance with Mine Plan <br />Problem: Not following Stipulation #1 of Amendment 01 <br />Attached is the notarized agreement we have with the oil company owning the structure <br />noted. This covers all activities within 200 feet of their structures including the gaslines. <br />During construction of the slurry wall Kerr McGee had a representative on site whenever a <br />gasline was crossed to monitor our activities. At no time did they object or find fault with
The URL can be used to link to this page
Your browser does not support the video tag.