My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-19_GENERAL DOCUMENTS - M1983194
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1983194
>
2010-08-19_GENERAL DOCUMENTS - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:19:25 PM
Creation date
8/24/2010 2:38:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
8/19/2010
Doc Name
Notice of Intent to Construct a Water Supply Pipeline for the NSI Backup Water Supply Well
From
Daub & Associates, Inc.
To
BLM
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TU n ,SSS <br />DAUB & ASSOCIATES, INC. <br />August 18, 2010 <br />Mr. Paul Daggett <br />Bureau of Land Managem <br />220 East Market Street <br />Meeker, CO 81641 <br />t,? p t3 <br /> <br />Division V: .. ., ;1 1, <br />tilinkig and Safety <br />1985'/2 SOUTH BROADWAY <br />GRAND JUNCTION, CO 81507-9649 <br />(970) 254-1224 <br />FAX (970) 242-8438 <br />email: gjdaub@daubandassociates.com <br />www.daubandassociates.com <br />RECEIV%g / <br />AUG 19 Nio <br />GRAND JUNCTION FIELD OFFICE <br />DIVISION OF <br />RECLAMATION MINING & SAFELY <br />Re: Notice of Intent to Construct a Water Supply Pipeline for the NSI Backup Water/ <br />Supply Well . <br />Dear Mr. Daggett: <br />Natural Soda, Inc (NSI) plans to construct a water supply pipeline between the 2010-26-198-2C <br />well and the existing water supply pipeline that runs between the' 90-1 water supply well and the <br />process plant. The proposed water supply pipeline will be approximately 1100 feet of 6 inch <br />plastic pipe buried approximately 5 feet below ground surface. A northeast trending drainage <br />will be traversed near the middle portion of the pipeline run, approximately 615 feet west- <br />northwest of 2010-26-198-2C well. The water supply pipeline will span the drainage incased <br />and insulated within a length of 9 3/8 inch casing. The drainage will be spanned approximately <br />5 feet above the bottom of the drainage. Two check valves will be installed to prevent backflow, <br />one each in the new and existing water supply lines. Attached to this letter please find an aerial <br />map of the proposed pipeline path. Reclamation efforts for disturbed land associated with the <br />pipeline construction will commence this fall. <br />Should you have any questions or comments, please contact me at (970) 254-1224 or (970) <br />216-1010 (c), or Bob Warneke at (970) 878-3674 ext. 14. <br />Regards, <br />7 <br />Gerald J. Daub, P.G., C.P.G. <br />President <br />Daub & Associates, Inc. <br />Cc: Bob Warneke <br />Executive Director of Manufacturing <br />Natural Soda, Inc. <br />Travis Marshall <br />Colorado Division of Reclamation, Mining and Safety <br />File <br />SPECIALIZING IN PROFESSIONAL GEOLOGICAL, ENVIRONMENTAL, HYDROLOGICAL, GEOTECHNICAL AND PERMITTING SERVICES
The URL can be used to link to this page
Your browser does not support the video tag.