Laserfiche WebLink
Topsoil / Fines Application <br />Volume of material moved calculated: <br />Disturbed surface area = 15 acres <br />Fines distributed at 0.5 ft. over disturbed area <br />Topsoil distributed at 0.5 ft over disturbed area <br />A = 15 acres x 43,560 ft. = 653,400 ft.2 <br />V = 653,400 ft.3 = 24,200 yd S.3