Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 03a State :Colorado Permit/job# :M-1981-088 <br />Date : 0811912010 County :Routt Abbreviation :none <br />User : DMC Site :Mccoy Pit Filename :M088-03a <br />Agency or organization name: DRMS <br />Permit or other job action :112c Scoria <br />Task description : Distribute fines stock piles over affected area <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (200,1 Horsepower : 310 _ <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :NA <br /> Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $46.56 NA <br /> Operating cost/hour : $70.63 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $155.72 Total fleet cost/hour : $155.72 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 50,000 LCY factor : NA volume.: 50,000 LCY <br /> <br />Source of estimate d volume :Exhibit L Reclamation Costs <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 491.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Partly consolidated stockpile Spoil pile : 0.70 (fnd-mt) <br /> Push gradient : 1.33 (Cat HB) <br />Average push gradient : 15.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,700 feet Material weight : 0.96 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,400 Ibs/LCY Net correction : 0.61 <br />Weight description <br />Sand - Dry, loose Adjusted unit production : 300.20 LCY/hr <br /> Adjusted fleet production : 300.20 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 166.56 Hours <br />Unit cost : $0.519 /LCY Total job cost : $25,937 <br />