My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-18_REVISION - C1980007 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2010-08-18_REVISION - C1980007 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:19:21 PM
Creation date
8/24/2010 2:07:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
8/18/2010
Doc Name
Adequacy Review
From
Marcia Talvitie
To
Tom Kaldenbach
Type & Sequence
MR367
Email Name
MLT
SB1
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />COLORADO <br />D I V I S 10 N OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Date: 18 August 2010 <br />To: Tom Kaldenbach, Lead Specialist "'Po <br />From: Marcia L. Talvitie, P.E. <br />Subject: West Elk Mine - Permit No. C-1980-007 <br />MR-367 - As-builts for CPP Pilings <br />Adequacy Review - Engineering <br />Bill Ritter, Jr. <br />Governor <br />4amer8-Marti n11J ke kt %J <br />Executive Director <br />Loretta E. Pineda <br />Director <br />RECEWD <br />AUG 2 3 2010 <br />Division 43r: G,r?i}t <br />Alining <br />In accordance with your 17-Aug-2010 request via Email, I have reviewed the as-built drawing <br />provided by Mountain Coal Company for the steel piles installed beneath the Coal Preparation <br />Plant (CPP). <br />Construction of the CPP atop the previously constructed Lower Refuse Pile (LRP) was approved <br />by the Division with TR-118. Prior to actual construction of the CPP, the contractor determined <br />that installing an array of steel piles beneath the approved mat foundation would improve the <br />overall stability of the CPP. <br />The Division approved the use of the steel pilings with MR-363 and the attached Stipulation No. <br />80. With MR-367, MCC has submitted as-built drawings of the steel H-beam layout. This plan <br />sheet adequately satisfies the requirements of the Stipulation. <br />Please do not hesitate to contact me if you require additional information regarding my review. <br />cc: Sandy Brown, DRMS <br />Office of office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.