My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-19_REVISION - M1977285 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977285
>
2010-08-19_REVISION - M1977285 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:19:27 PM
Creation date
8/24/2010 10:51:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
Revision
Doc Date
8/19/2010
Doc Name
Operator Acceptance of Amendment Requirements (Sunday Mine)
From
Denison Mines
To
DRMS
Type & Sequence
AM3
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 11 <br />Water Quality Monitoring Plan <br />mean ambient water quality from the subsurface monitoring wells nest samples <br />multiplied by two times the standard deviation of the concentrations. In the event that <br />the water quality at the downgradient wells exceeds the compliance limit, the <br />frequency of sampling at the compliance well will be increased to monthly and the <br />Division will be notified. In the event that ambient water quality is exceeded at any <br />downgradient well for a continuous period of three months or more, potential <br />additional actions will be developed by Denison in consultation with DRMS. <br />The two compliance wells would be installed at the locations specified on Figure 11-1. <br />These two wells are located on public lands and will be subject to BLM approval. The <br />wells would be installed in accordance with DRMS and CDPHE requirements, and <br />would be screened within the Salt Wash Member of the Morrison Formation to <br />provide samples of water within the hydrogeologic unit affected by Denison mining <br />operations. In order to accurately identify the proper screening interval, down hole <br />geophysical logging for each compliance well will be completed. The log analyses and <br />interpretations will be performed by a qualified log analyst. Plans and specifications <br />for the wells will be submitted to DRMS prior to construction and well logs and <br />construction completion diagrams would be submitted after installation. The plan for <br />sealing and closure of the wells will also be submitted to DRMS as part of the plans <br />and specifications package. <br />Groundwater sampling would include measuring the static water table with a well <br />probe; purging the well in accordance with best practices; measurement of field <br />parameters, and collection of samples for laboratory analyses. Exhibit 11-1 provides a <br />list of analytical parameters that will be sampled as part of the quarterly groundwater <br />monitoring program. This parameter list is based on the approved analyte list <br />developed in the Groundwater Characterization Data Collection Work Plan to <br />Address Designated Mining Operations (DMO) Status Sunday Mines Group, San <br />Miguel County, Colorado (CDM 2008e). <br />Exhibit 11-1. Compliance Monitoring Analytical Parameters <br />Analytes Method Reporting Limit (Ng/L)l <br />pH Field --- <br />Conductivity Field --- <br />Dissolved Oxygen Field --- <br />Oxidation Reduction Potential Field --- <br />Total Dissolved Solids SM 2540C 10,000 <br />Hardness SM 2340C NA <br />Chloride EPA 300.0 1000 <br />Fluoride SM 450OF-C 100 <br />Sulfate EPA 300.0 1000 <br />Gross Alpha EPA 900.0 MDC <br />Gross Beta EPA 900.0 MDC3 <br />Nitrate EPA 353.2 50 <br />Nitrite EPA 353.3 100 <br />Aluminum EPA 200.8/200.7 100 <br />Antimony EPA 200.8/200.7 1 <br />Arsenic EPA 200.8/200.7 1 <br />11-2 <br />CADocuments and Settings\c od% ard.DMC\Desktop\Current TO DO\SundaysWINAL DRMS Report RTCv2 - EPP Sunday Mines.doc
The URL can be used to link to this page
Your browser does not support the video tag.